Get the Ship Date in Writing When You Order Special Items

By DeskTech HQ · · 1 min read

The windows were ordered in week two. In week six the supplier says they are on backorder. Nobody asked for a ship date in writing. A four-minute email on order day gives you something to hold them to. The question is how likely a backorder surprise is for the email to pay.

The steps

  1. Price the step: minutes × the value of your time.
  2. Price a backorder surprise: days of delay at holding cost.
  3. Break-even chance = step cost ÷ delay cost.
  4. Order early too (buying rehab materials early: discount vs. carrying cost).

A worked example

Example (illustrative arithmetic, not predictions)

The step takes 4 minutes at $60 an hour: $4. A backorder surprise costs 5 days at $20 a day: $100. Every figure is a made-up round number.

Chance of a backorder surprise Expected cost avoided (chance × $100) Avoided − $4
2% $2 −$2
4% $4 $0 (break-even)
8% $8 +$4
12% $12 +$8

The step pays at a 4% chance of a backorder surprise: $4 ÷ $100. For made-to-order items, it is plausible.

Email the supplier the day you order, ask for the ship date and a delivery estimate, keep the reply with the order and re-check two weeks before. Treat the date as an estimate.

Making it routine

  1. Email the supplier on order day.
  2. Ask for ship date and delivery estimate.
  3. Keep the reply with the order.
  4. Re-check two weeks before.

Run your own numbers

Use the free holding cost calculator below to see what a day of delay costs on your own flip.

Quick answers

What is a special-order item?

A window, cabinet or fixture made or ordered for your job.

How do I price the step?

The minutes to ask and file the reply times the value of your time.

What does a backorder cost?

Days of delay at your holding cost.

What is the break-even chance?

The step's cost divided by the delay cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.