Ask the Tenant to Tell You Before a Long Absence in Winter

By DeskTech HQ · · 1 min read

A tenant leaves for six weeks in January and turns the heat down to save money. A pipe freezes and floods the unit below. A line in the welcome message asking the tenant to say so before a long absence and to keep the heat on takes three minutes. The question is how likely a frozen pipe is for the line to pay.

The steps

  1. Price the line: minutes × the value of your time.
  2. Price a frozen pipe: water damage, drying and repairs.
  3. Break-even chance = line cost ÷ damage cost.
  4. Add an alarm for vacancies (put a wifi temperature alarm in the vacant unit).

A worked example

Example (illustrative arithmetic, not predictions)

The line takes 3 minutes at $60 an hour: $3. A frozen pipe costs $1,500 to dry and repair. Every figure is a made-up round number.

Chance of a frozen pipe during an absence Expected cost avoided (chance × $1,500) Avoided − $3
0.1% $1.50 −$1.50
0.2% $3 $0 (break-even)
0.6% $9 +$6
1% $15 +$12

The line pays at a 0.2% chance of a frozen pipe: $3 ÷ $1,500. In a cold climate with older plumbing, it is easily exceeded.

Add the request to the welcome message and the lease where the law allows, explain the reason in a sentence and do not use it as grounds to enter. Check state rules on entry and notice.

Making it routine

  1. Add the request to the welcome message.
  2. Explain the reason in a sentence.
  3. Do not treat it as a right to enter.
  4. Check state rules on entry and notice.

Run your own numbers

Use the free BRRRR calculator below to see how an avoided repair affects your returns on a hold.

Quick answers

What is the request?

A line asking the tenant to let you know before being away for a long time and to leave the heat on.

How do I price it?

The minutes to add it to the welcome message times the value of your time.

What does a frozen pipe cost?

Water damage, drying and repairs.

What is the break-even chance?

The line's cost divided by the damage cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.