Borrower Check-In Calls: Is a Monthly Call Worth It?

By DeskTech HQ · · 2 min read

A lender who hears about a stalled project in month five has fewer options than one who heard in month two. A short call each month is a cheap way to hear sooner. The question is how often it has to turn up a real problem to justify itself.

The steps

  1. Price a call: minutes spent, including notes, times the value of your time.
  2. Multiply by the calls over the loan term.
  3. Estimate what a problem caught early saves, such as a stalled contractor or a budget gap (in-balance test).
  4. Divide the total cost of the calls by that saving. That is the break-even chance.
  5. Compare it with how often calls have actually caught something in your records.

A worked example

Example (illustrative arithmetic, not benchmarks)

A call plus notes takes 20 minutes. Your time is worth $60 an hour, so a call costs $20. The loan has a 6-month term, so 6 calls cost $120. A problem found early saves about $4,000 over one found late. Every figure is a made-up round number.

Chance a call catches a real problem Expected saving (× $4,000) Cost of calls Net
2% $80 $120 −$40
3% $120 $120 $0
5% $200 $120 +$80
Break-even $120 ÷ $4,000 = 3.0%

If one loan in thirty has a problem that only a call would catch early, the calls pay for themselves. Your records will tell you whether that is true for your borrowers. A call is cheaper than an inspection, but it only reports what the borrower says, so it does not replace one (draw inspections).

Calls also build a record. A note of what the borrower said and when helps if you later have to decide between an extension and enforcement (loan workout options). Keep the notes factual and leave the loan terms to the documents (late payment communication).

Making it routine

  1. Set a call date on the calendar for every active loan.
  2. Use the same short list of questions each time.
  3. Write down what you learned, and what you did not promise.
  4. Track how often a call caught something, and re-run the break-even yearly.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the loan amount and holdback you are monitoring.

Quick answers

What is a check-in call?

A short, regular conversation with the borrower during the project to learn how the work, the budget and the schedule are going.

How do I decide whether it is worth it?

Total the cost of the calls over the loan and divide by the loss an early warning would prevent. The result is the chance of a problem the call would catch that makes it break even.

What should a call cover?

Progress against the schedule, the budget, upcoming draws and anything that has changed. Keep notes and make no promises that change the loan terms.

Can a call replace an inspection?

No. A call tells you what the borrower says, and an inspection tells you what is there. They catch different things.

Do the numbers in this guide apply to my loans?

No. The time, hourly cost, loan size and savings are made up for the example. They are not benchmarks.

Keep reading

Loan servicing

Annual Borrower Updates: Worth the Time?

Learn how to weigh the time an annual borrower financial update takes against the problems it can reveal early, and how often it must find one to pay.

· 2 min read
Loan servicing

One Late Notice or Three? Cost vs Cure Rate

Learn how to compare the cost of sending more late-payment notices with the extra payments they bring in, and how far the cure rate must rise to pay.

· 2 min read
Loan servicing

Annual Borrower Contact Update: The Odds That Pay

Learn how to price a ten-minute yearly check of each borrower's phone, email and address and find the chance of lost contact that makes it pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.