Carry a Moisture Meter on the Walk-Through: The Odds
A wall in the back bedroom looks fine and feels dry. A pin-less moisture meter would show a wet patch six inches wide. A scan of walls under windows, around tubs and below roof lines takes fifteen minutes. The question is how likely a hidden wet wall is for the scan to pay.
The steps
- Price the scan: minutes × the value of your time.
- Price a hidden wet wall: opening, drying and repair.
- Break-even chance = scan cost ÷ repair cost.
- Compare with testing (mold testing before you offer).
A worked example
Example (illustrative arithmetic, not predictions)
The scan takes 15 minutes at $60 an hour: $15. A hidden wet wall costs $1,500 to open, dry and repair. Every figure is a made-up round number.
| Chance of a hidden wet wall | Expected cost avoided (chance × $1,500) | Avoided − $15 |
|---|---|---|
| 0.5% | $7.50 | −$7.50 |
| 1% | $15 | $0 (break-even) |
| 3% | $45 | +$30 |
| 6% | $90 | +$75 |
The scan pays at a 1% chance of a hidden wet wall: $15 ÷ $1,500. In an older house with a history of leaks, it is plausible.
Scan under windows, around tubs and showers, below roof lines and along basement walls, note any high readings and tell your inspector. A meter does not find the source of water.
Making it routine
- Scan under windows and around tubs.
- Scan below roof lines and basement walls.
- Note high readings and photograph the spot.
- Tell your inspector.
Run your own numbers
Use the free MAO calculator below to see how a hidden repair changes the most you can offer.