Test the Garage Door Opener on the Walk-Through

By DeskTech HQ · · 1 min read

The opener works from the wall button and not from the remote. The safety reverse does not respond. A three-minute test on the walk-through shows both. The question is how likely a bad opener is for the test to pay before you offer.

The steps

  1. Price the test: minutes × the value of your time.
  2. Price a new opener: the unit and its installation.
  3. Break-even chance = test cost ÷ opener cost.
  4. Compare the door too (garage door: repair or replace).

A worked example

Example (illustrative arithmetic, not predictions)

The test takes 3 minutes at $60 an hour: $3. A new opener costs $300 installed. Every figure is a made-up round number.

Chance the opener or reverse is bad Expected cost avoided (chance × $300) Avoided − $3
0.5% $1.50 −$1.50
1% $3 $0 (break-even)
3% $9 +$6
6% $18 +$15

The test pays at a 1% chance that the opener or its reverse is bad: $3 ÷ $300. On an older garage, it is easily exceeded.

Open and close the door from the wall and the remote, lay a block of wood in the path and check that the door reverses when it touches it. Keep people and pets clear, and never reach under a moving door.

Making it routine

  1. Run it from the wall and the remote.
  2. Lay a block of wood in the path.
  3. Check that the door reverses.
  4. Keep people and pets clear.

Run your own numbers

Use the free MAO calculator below to see how a new opener changes the most you can offer.

Quick answers

What is the auto-reverse test?

Checking that a closing door reverses when it meets an obstruction.

How do I price the test?

The minutes times the value of your time.

What does a bad opener cost?

A new opener installed.

What is the break-even chance?

The test's cost divided by the opener cost.

Do the numbers in this guide apply to my deal?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.