Check Each Listed Bedroom for a Door, Closet and Window

By DeskTech HQ · · 1 min read

The listing says four bedrooms. One is a basement room with a small window and no closet, and another has no door. Appraisers and buyers may count two. A ten-minute check of each room costs ten dollars of your time. The question is how likely a bedroom count is to fall for the check to pay before you offer.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a lost bedroom: a lower price or rent.
  3. Break-even chance = check cost ÷ cost of a lost bedroom.
  4. See what a bedroom adds (converting a den to a bedroom).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 10 minutes at $60 an hour: $10. A lost bedroom would cost $2,500 in value. Every figure is a made-up round number.

Chance a listed bedroom does not count Expected cost avoided (chance × $2,500) Avoided − $10
0.2% $5 −$5
0.4% $10 $0 (break-even)
1.2% $30 +$20
2% $50 +$40

The check pays at a 0.4% chance that a listed bedroom does not count: $10 ÷ $2,500. In a house with a finished basement or an attic, it is easily exceeded.

Check each room for a door, a closet, a window of useful size that opens and a way out, and measure the floor area. Then ask the building department how your area defines a bedroom.

Making it routine

  1. Check each room for a door, closet and window.
  2. Check that the window opens.
  3. Measure the floor area.
  4. Ask the building department how it defines a bedroom.

Run your own numbers

Use the free MAO calculator below to see how a lower bedroom count changes the most you can offer.

Quick answers

Why check?

A room listed as a bedroom may not count as one under local code.

How do I price the check?

The minutes times the value of your time.

What does a lost bedroom cost?

A lower price or rent than the listing implies.

What is the break-even chance?

The check's cost divided by that cost.

Do the numbers in this guide apply to my deal?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.