Choosing Between Two Flip Deals When Cash Is Limited

By DeskTech HQ · · 2 min read

Two deals, one pile of cash. One makes more dollars. The other makes them faster on less money. Which one is better depends on what the cash could do next.

The steps

  1. Return on cash = profit ÷ cash needed.
  2. Annualized return = return on cash × 12 ÷ months held (annualized return).
  3. Profit per month = profit ÷ months held.
  4. Deals per year the cash can fund, if similar deals keep coming.

A worked example

Example (illustrative arithmetic, not market data)

Deal X: $32,000 profit, $95,000 of cash, 6 months. Deal Y: $24,000 profit, $60,000 of cash, 4 months. You have $120,000. Every figure is a made-up round number.

Item Deal X Deal Y
Return on cash 33.68% 40.00%
Annualized return 67.4% 120.0%
Profit per month $5,333 $6,000
Deals that fit in $120,000 at once 1 2
Cycles in 12 months 2 3
Profit in 12 months 1 × 2 × $32,000 = $64,000 2 × 3 × $24,000 = $144,000

Deal X earns more per deal, but it needs $95,000 of the $120,000 and leaves $25,000 idle. Deal Y lets two projects run side by side and repeat. The $144,000 assumes six similar deals are really available and each goes to plan, which is a large assumption. If only one Y-type deal appears, the comparison looks very different.

Before you choose

  1. Compare how far each could miss (break-even price).
  2. Keep a reserve on each project (cash reserve).
  3. Test the cost of capital if you need to borrow (cash, hard money or partner).
  4. Write down the choice and the reason, then compare it with the real result (year-end review).

Run your own numbers

Use the free holding cost calculator below to see how the number of months changes the cost of each deal.

Quick answers

Why not just pick the deal with the bigger profit?

Profit alone ignores how much cash a deal ties up and for how long. A smaller deal that needs less cash and finishes sooner can leave room for more projects in the same year.

Which measures should I compare?

Profit, cash needed, months held, return on cash, and profit per month. Look at all of them together, since each one hides something.

Does a higher annualized return guarantee a better year?

No. It assumes another similar deal is available when the first one ends. If it is not, the cash sits idle and the comparison changes.

How does risk fit in?

The numbers assume the plan works. Compare how far each deal could miss, such as its break-even price and its cash reserve, before choosing on return alone.

Do the numbers in this guide apply to my deals?

No. The profits, cash and months are made up for the example. They are not market data or a prediction of results.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.