Flip Profit and ROI: Net Profit vs Return on Cash
A flip can look profitable on the purchase price and the sale price alone. Net profit comes only after every cost is counted, and two common ways of measuring return can give very different percentages for the same deal.
Step 1: add up every cost
- Purchase and rehab. The price paid and the work done (rehab budget basics).
- Financing. Points and interest (how to read a loan term sheet).
- Holding. Taxes, insurance and utilities (holding costs on a flip).
- Buying costs. Closing costs on the purchase (buyer closing costs).
- Selling costs. Commission and closing costs at sale (closing net sheet).
A worked example
Example (illustrative arithmetic, not market data)
Assume a $120,000 purchase, a $40,000 rehab, a loan of $96,000 at 12% interest-only with two points, a six-month project, and a sale at $225,000. Every figure is a made-up round number.
| Item | Calculation | Amount |
|---|---|---|
| Purchase and rehab | $120,000 + $40,000 | $160,000 |
| Points | 2% × $96,000 | $1,920 |
| Interest | 6 × ($96,000 × 0.12 ÷ 12) | $5,760 |
| Other holding costs | 6 × $600 | $3,600 |
| Buying costs | given | $5,000 |
| Selling costs | 8% × $225,000 | $18,000 |
| Total cost | sum | $194,280 |
| Net profit | $225,000 − $194,280 | $30,720 |
Two ways to measure return
| Measure | Calculation | Result |
|---|---|---|
| Return on total cost | $30,720 ÷ $194,280 | 15.8% |
| Cash invested | $160,000 + $1,920 + $5,760 + $3,600 + $5,000 − $96,000 loan | $80,280 |
| Return on cash | $30,720 ÷ $80,280 | 38.3% |
| Simple annualized (2 projects a year) | 38.3% × 2 | 76.5% |
The loan raises the return on cash from 15.8% to 38.3%, and it also means a smaller sale price would cut into the cash invested. Annualizing assumes a second deal of the same size can be found and finished, which cannot be counted on (cash-on-cash return explained).
Check before you buy
- Are all five cost groups in the number?
- What happens to profit if the sale price is 5% lower?
- What if the project takes two months longer?
- Is the return measured on total cost or on cash?
Run your own numbers
Use the free holding cost calculator below to see how extra months change the profit.