Comp Adjustment Grid: Turning Three Sales Into One Value
Three recent sales near the house sold for $305,000, $289,000 and $312,000. The house will not sell for the average of those, because none of them is the house. An adjustment grid turns three different houses into three estimates of the same one.
The steps
- List comps with sale price, date, size, bedrooms, bathrooms, garage, lot and condition.
- Compare each with your property, feature by feature.
- Adjusted price = sale price ± dollar adjustments (subtract for features the comp has and yours lacks; add for the reverse).
- Compare gross adjustments (the sum of all adjustments, ignoring signs) with the sale price: smaller means more reliable.
- Weigh the adjusted prices and choose a value, leaning low.
A worked example
Example (illustrative arithmetic, not an appraisal)
The finished subject house: 1,600 sq ft, 3 bedrooms, 2 baths, no garage, standard lot, updated kitchen. Adjustment of $85 per square foot of size; garage $10,000; one extra bath $5,000; larger lot $3,000. Every figure is a made-up round number (estimating value with comps).
| Item | Comp A | Comp B | Comp C |
|---|---|---|---|
| Sale price | $305,000 | $289,000 | $312,000 |
| Size difference | 1,700 sq ft: −$8,500 | 1,550 sq ft: +$4,250 | 1,650 sq ft: −$4,250 |
| Garage | has one: −$10,000 | none: $0 | has one: −$10,000 |
| Bathrooms | same: $0 | 1.5 baths (subject has more): +$5,000 | same: $0 |
| Lot | same: $0 | same: $0 | larger: −$3,000 |
| Adjusted price | $286,500 | $298,250 | $294,750 |
| Gross adjustments | $18,500 | $9,250 | $17,250 |
| Gross as % of sale price | 6.1% | 3.2% | 5.5% |
Average of the three adjusted prices: $293,167. The spread is $11,750, or 4.0% of the average. Comp B needed the smallest adjustments, so weighting it double gives ($286,500 + 2 × $298,250 + $294,750) ÷ 4 = $294,438. A cautious plan would use about $293,000, the lower of the two.
Why it matters. The earlier examples in this series used a $300,000 value. At $293,000 the sale brings $7,000 × 0.92 = $6,440 less after selling costs, so a deal that made $29,200 now makes $22,760 (sensitivity table).
Using the grid
- Prefer comps within a short distance and a few months, and note why you dropped any.
- Ask a local agent to check the dollar adjustments (selling costs).
- Plan on the lower value and test a lower one still (break-even price).
- Save the grid with the deal, and compare it with the actual sale price afterward (profit variance).
Run your own numbers
Use the free maximum allowable offer calculator below to test a purchase price against your adjusted value.