How to Estimate After-Repair Value (ARV) With Comps
Almost every number in a flip depends on one estimate: what the house will be worth after the work is done. That estimate is the after-repair value, or ARV. It sets your maximum offer, how much a lender will size the loan to, and how much profit is left at the sale. If ARV is too high, every other number looks better than it really is.
What counts as a good comp
A comparable sale (“comp”) is a home that sold recently and is similar to the one you will have after the renovation. Look for:
- Closed sales, not active listings. A listing shows what a seller hopes for. A closed sale shows what a buyer actually paid.
- Recent sales, usually from the last few months, because prices move.
- Close by, ideally the same neighborhood, since a few blocks can change the price.
- Similar homes: size, bedrooms, bathrooms, age, style, lot and garage.
- Renovated condition. Your ARV is for the finished house, so compare it with finished houses, not ones that sold needing work.
Adjust for the differences
No two homes are identical. If a comp has a garage and yours does not, or one more bathroom, its price overstates what yours would bring. Adjust each comp up or down for the differences, and write down the reason for every adjustment so you can check it later. Keep the adjustments small. If you need big ones to make a comp work, it is probably the wrong comp.
A worked example
Example (illustrative arithmetic, not market data)
Assume the finished house will be about 1,300 square feet. Three renovated homes nearby sold recently. Every figure below is a made-up round number.
| Comp | Sale price | Size | Price per sq ft |
|---|---|---|---|
| A | $225,000 | 1,500 sq ft | $150 |
| B | $238,000 | 1,400 sq ft | $170 |
| C | $192,000 | 1,200 sq ft | $160 |
The three prices per square foot average $160. Applied to 1,300 square feet:
| Estimate | Price per sq ft | ARV |
|---|---|---|
| Low (comp A) | $150 | $195,000 |
| Middle (average) | $160 | $208,000 |
| High (comp B) | $170 | $221,000 |
Price per square foot is only a first cut. It ignores bedrooms, lots and finishes, which is why you also adjust and compare the homes one by one. The useful result is the range, here $195,000 to $221,000, not a single number.
See what a wrong ARV does
Plug each ARV into the 70% rule (how it works) with an assumed $30,000 of repairs: maximum offer = ARV × 70% − repairs.
| ARV | × 70% | − repairs | Maximum offer |
|---|---|---|---|
| $195,000 | $136,500 | $30,000 | $106,500 |
| $208,000 | $145,600 | $30,000 | $115,600 |
| $221,000 | $154,700 | $30,000 | $124,700 |
The $26,000 gap between the low and high ARV moves the maximum offer by $18,200. If you assume the high end and the sale lands at the low end, you have overpaid by that much before costs. This is why many investors plan around the middle or lower part of the range, and why lenders size loans to a percentage of ARV (LTV, LTC and ARV).
Common ARV mistakes
- Using active listings or asking prices as comps.
- Comparing your finished house with homes that sold needing work, or with a much nicer home.
- Using old sales in a market that has moved.
- Using the single best comp instead of the range.
- Forgetting that your rehab budget (how to budget it), holding costs (how they add up) and selling costs come out of the same ARV.
Test the deal at a lower ARV
Before you buy, rerun the numbers with an ARV 5% to 10% lower than your estimate. If the deal still works, you have room for surprises. If it only works at the top of the range, treat it as a risk, not a plan. You can also look at what the seller walks away with (closing net sheet) when you negotiate.