Contractor Call Before Funding: Fifteen Minutes That Pay
A rehab loan rests on a plan: a scope, a price, a schedule. The borrower tells you the plan. The contractor is the one who will carry it out. A short call to the contractor before funding can reveal a mismatch. The question is how rare a mismatch can be before the call stops paying.
The steps
- Value the fifteen minutes.
- Estimate the loss from a scope, price or schedule mismatch that you only discover later.
- Break-even chance = value of time ÷ loss.
- Do it alongside a license and insurance check (contractor insurance and license check).
A worked example
Example (illustrative arithmetic, not predictions)
Fifteen minutes at $40 an hour is $10. A mismatch could cost $4,000. Every figure is a made-up round number.
| Chance of a scope or schedule mismatch | Expected loss avoided (chance × $4,000) | Avoided − $10 |
|---|---|---|
| 0.1% | $4 | −$6 |
| 0.25% | $10 | $0 (break-even) |
| 2% | $80 | +$70 |
The call pays at a chance of one in 400: $10 ÷ $4,000. The real chance is far higher. Borrowers and contractors often have different ideas about what is included and when the work starts.
Ask the same questions each time: what is the scope, what is the price, when does work start, how long will it take, how do you expect to be paid, and who else is working on the job. Write down the answers and compare them with the borrower’s budget (the subcontractor insurance certificate check).
Making it routine
- Tell the borrower you will call the contractor.
- Ask the same questions each time.
- Record the answers in the loan file.
- Compare them with the budget and the schedule.