Subcontractor Insurance Certificates: Ten Minutes That Pay
A subcontractor who is hurt on your site, or damages the neighbor’s property, can bring a claim that reaches the owner if the sub has no insurance. A certificate of insurance takes a few minutes to request. The question is how unlikely a claim can be before it still pays.
The steps
- Value the minutes spent requesting and checking a certificate.
- Estimate the loss if an uninsured sub causes a serious claim.
- Break-even chance = value of time ÷ loss.
- Verify the certificate with the insurer (the GC markup question).
A worked example
Example (illustrative arithmetic, not predictions)
Ten minutes at $40 an hour is $6.67. An uninsured claim could cost $25,000. Every figure is a made-up round number.
| Chance of an uninsured serious claim | Expected loss avoided (chance × $25,000) | Avoided − $6.67 |
|---|---|---|
| 0.01% | $2.50 | −$4.17 |
| 0.027% | $6.67 | $0 (break-even) |
| 0.1% | $25.00 | +$18.33 |
| 0.5% | $125.00 | +$118.33 |
The check pays at a chance of about one in 3,750: $6.67 ÷ $25,000. The bar is so low that the question is not whether to collect certificates but why not to.
Collect them before the sub starts, not after. And verify them. A certificate that has lapsed or covers the wrong trade protects no one (insuring a vacant flip).
Making it routine
- Ask every sub for a certificate before they start.
- Verify coverage with the insurer or agent.
- Note the expiry dates.
- Hold work until the certificate is in.