Contractor Insurance and License: The Check Before You Hire
The bid is good, the schedule is open and the contractor can start Monday. Before the deposit, one hour spent on two checks, insurance and license, costs less than almost anything else on the job. The question is what it buys.
The steps
- Ask each contractor for a certificate of insurance and their license number for each licensed trade.
- Confirm the policy with the agent or insurer: active dates, coverage types, and who is covered.
- Look up the license on the licensing board’s records and note any complaints or lapses.
- Put the requirements in the contract and keep the documents with the job file (comparing bids).
- Re-check if the job runs past the policy dates.
A worked example
Example (illustrative arithmetic, not statistics)
Verification takes one hour, valued at $60. Suppose 8% of the contractors you consider have a lapsed or inadequate policy, and on a job with an uninsured contractor there is a 10% chance of a $25,000 claim that lands on you. Also suppose a 3% chance that unlicensed work costs $2,000 in permit trouble and re-inspection. Every figure is a made-up round number.
| Item | Per job |
|---|---|
| Cost of the check | $60 |
| Expected insurance loss avoided (8% × 10% × $25,000) | $200 |
| Expected license cost avoided (3% × $2,000) | $60 |
| Expected exposure avoided | $260 |
| Exposure avoided per dollar spent | 4.3 to 1 |
| Claim size at which the insurance check alone breaks even ($60 ÷ (8% × 10%)) | $7,500 |
The average hides the point. Nearly all the time, the check finds nothing and costs an hour. Once in a while it finds the one contractor who would have cost a $25,000 claim. A claim that large is the case you are insuring against, and the odds above are guesses (payment schedules).
The check does not replace a good contract. Pair it with a written scope, a payment schedule tied to progress, and lien waivers as you pay (scope of work).
Making it routine
- Make the certificate and the license number a required part of every bid.
- Verify with the issuer, not just the paper.
- Note the policy end date on the schedule and re-check if the job runs long.
- Ask your own agent what your policy requires of contractors (permits and inspections).
Run your own numbers
Use the free holding cost calculator below to price the delay if a job has to stop while a contractor’s paperwork is fixed.