Cover Stored Drywall and Flooring With a Tarp: The Odds
A stack of drywall sits in a garage with a leaky door, or a pallet of flooring sits on bare concrete. A wet edge swells and the sheet is scrap. A tarp costs about twenty dollars and five minutes. The question is how likely damaged material is for the tarp to pay.
The steps
- Price the tarp: cost + minutes × the value of your time.
- Price damaged material: the material and a reorder delay.
- Break-even chance = cover cost ÷ damage cost.
- Pair it with a stored-materials rule (paying for stored materials).
A worked example
Example (illustrative arithmetic, not predictions)
The tarp costs $20 plus 5 minutes at $60 an hour ($5): $25. Damaged material costs $250 to replace. Every figure is a made-up round number.
| Chance of damaged stored material | Expected cost avoided (chance × $250) | Avoided − $25 |
|---|---|---|
| 5% | $12.50 | −$12.50 |
| 10% | $25 | $0 (break-even) |
| 20% | $50 | +$25 |
| 30% | $75 | +$50 |
The tarp pays at a 10% chance of damaged material: $25 ÷ $250. In a damp season, it is plausible.
Store material flat on pallets or 2-by-4s off the floor, cover it loosely so air can move, and check it each visit. Do not cover wet material. Tell your insurance agent what you store and where.
Making it routine
- Store material flat and off the floor.
- Cover it loosely so air moves.
- Check it each visit.
- Tell your agent what you store.
Run your own numbers
Use the free holding cost calculator below to see what a day of delay for a reorder costs on your own flip.