Photograph the Open Walls Before the Drywall Closes Them

By DeskTech HQ · · 1 min read

A year later a switch fails and nobody knows where the cable runs. The wall is cut open at a guess. Photos of the open walls before the drywall goes up take twelve minutes. The question is how likely a wall will need to be opened again for the photos to pay.

The steps

  1. Price the photos: minutes × the value of your time.
  2. Price opening a wall again: a cut, a patch and paint.
  3. Break-even chance = photo cost ÷ cost of opening a wall.
  4. Test the plumbing first (pressure-test the plumbing before the drywall goes up).

A worked example

Example (illustrative arithmetic, not predictions)

The photos take 12 minutes at $60 an hour: $12. Opening a wall again costs $400. Every figure is a made-up round number.

Chance a wall must be opened again Expected cost avoided (chance × $400) Avoided − $12
1.5% $6 −$6
3% $12 $0 (break-even)
6% $24 +$12
10% $40 +$28

The photos pay at a 3% chance that a wall must be opened again: $12 ÷ $400. Over a house with many walls, it is plausible.

Shoot each open wall with a tape measure in frame, after inspections and before insulation or drywall, name files by room and wall and keep them in the project folder. Stay clear of live wiring.

Making it routine

  1. Shoot each wall with a tape measure in frame.
  2. Do it after inspection and before insulation.
  3. Name files by room and wall.
  4. Keep them in the project folder.

Run your own numbers

Use the free holding cost calculator below to see what a delay from reopening a wall costs on your own flip.

Quick answers

What do you photograph?

Each open wall with a tape measure in frame, showing wiring, pipes and blocking.

How do I price it?

The minutes times the value of your time.

What does opening a wall again cost?

A cut, a patch and repainting.

What is the break-even chance?

The photos' cost divided by that cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.