Stored Materials: Funding Before the Work Is in Place

By DeskTech HQ · · 2 min read

A contractor asks for $12,000 against cabinets that are still in a supplier’s warehouse. If the supplier fails or the order never ships, the lender has paid for materials that are not in the house. A few simple checks cost little. The question is how much risk makes them worth it.

The steps

  1. Write down the amount of the stored-materials request.
  2. Price the checks you would make: an invoice and proof of payment, photos, a call to the supplier or a site visit (draw request review).
  3. Divide the cost of the checks by the amount at risk. That is the break-even chance of a loss.
  4. Compare it with how likely a loss is for this contractor and supplier.
  5. Decide which requests need the checks and which do not.

A worked example

Example (illustrative arithmetic, not benchmarks)

A request for $12,000 of materials not yet installed. The checks (invoice review, photos and a supplier call) cost you $40 of time. If the materials are never delivered you lose the $12,000. Every figure is a made-up round number.

Chance the materials are never delivered Expected loss (× $12,000) Cost of checks Net
0.2% $24 $40 −$16
0.33% $40 $40 $0
1% $120 $40 +$80
Break-even $40 ÷ $12,000 = 0.33%

The break-even is a third of one percent. For a contractor with no history with you, or a supplier you cannot reach, the chance of a problem is likely higher than that. For a contractor you have worked with on twenty loans, it may be lower. Scale the checks to the risk: a short call for a known builder, more for a new one (vetting the borrower’s contractor).

Paying early is not the only choice. You can pay when the materials are delivered, hold back a share until installation, or pay the supplier directly. Each shifts the risk, and each is a term to set in the loan documents (lien waivers on draws).

Making it routine

  1. Set a written rule for stored-materials requests in the loan documents.
  2. Use the same short list of checks every time, scaled to the amount.
  3. Record any request that went wrong.
  4. Re-run the break-even with your own record.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how the holdback is set up against the construction budget.

Quick answers

What is a stored materials draw?

A draw request for materials that have been bought but not yet installed, such as cabinets or windows waiting at a supplier or on site.

What is the risk?

The materials may not be delivered, may be lost or damaged, or may be subject to a supplier's claim before they reach the property.

What checks can a lender make?

Common ones are an invoice, proof of payment, photos of the materials in place, and confirmation of where they are kept. The loan documents set the rules.

How do I price the checks?

Divide the cost of the checks by the amount at risk. The result is the chance of a loss at which the checks pay for themselves.

Do the numbers in this guide apply to my loans?

No. The amounts, cost and odds are made up for the example. They are not benchmarks.