Credit Score Cutoff: The Default Rate That Breaks Even
A lender who lowers the credit score minimum will make more loans. Some of them will default. The question is how high the default rate can go before the added loans lose money.
The steps
- Take the profit on a loan that performs.
- Take the loss on a loan that defaults.
- Break-even default rate = profit ÷ (profit + loss).
- Compare with the default rate you actually see in that tier (the underwriting checklist).
A worked example
Example (illustrative arithmetic, not benchmarks)
A good loan earns $3,000. A defaulted loan loses $40,000 after recovery. Every figure is a made-up round number.
| Default rate in the added tier | Expected profit per loan | Item |
|---|---|---|
| 3% | $1,710 | Adds profit |
| 7% | about $0 | Break-even |
| 10% | −$1,300 | Loses money |
| 15% | −$3,450 | Loses money |
The tier breaks even at about a 7% default rate: $3,000 ÷ $43,000. Because one default wipes out many good loans, the tolerable rate is low. A tier that defaults one time in ten loses money even though nine in ten perform.
The numbers also depend on the deal. A loan at a lower leverage with strong collateral loses much less on a default, which moves the break-even up. A score is one input, not the whole decision (streamlined underwriting).
Making it routine
- Write down the criteria and apply them to everyone.
- Track defaults and losses by tier.
- Compute the break-even rate.
- Review the cutoff each year with an attorney.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how leverage changes the loss on a default.