Streamlined Underwriting for Repeat Borrowers: Time vs Risk
A borrower who has closed four loans with you and paid them all off does not need the same file as a stranger. Reviewing them from scratch costs hours. Skipping the review costs risk. The question is how much risk the saved hours can justify.
The steps
- Time a full review and a streamlined one, including the file notes.
- Compute the hours saved and what they are worth.
- Estimate the loss a default would cost on a typical loan (loan-level profit).
- Divide the saving by the loss. That is how much the chance of default can rise before the saving is gone.
- Decide which items to refresh every time, and write the criteria for who qualifies.
A worked example
Example (illustrative arithmetic, not benchmarks)
A full review takes 6 hours and a streamlined one 2.5 hours. Your time is worth $60 an hour. A default would cost about $30,000 on a typical loan. Every figure is a made-up round number.
Hours saved: 6 − 2.5 = 3.5. Value: 3.5 × $60 = $210 per loan.
The saving is spent if the streamlined review raises the chance of default by $210 ÷ $30,000 = 0.7 percentage points.
| Extra chance of default from the shorter review | Expected extra loss (× $30,000) | Time saved | Net per loan |
|---|---|---|---|
| 0.3 points | $90 | $210 | +$120 |
| 0.7 points | $210 | $210 | $0 |
| 1.5 points | $450 | $210 | −$240 |
The saving is small relative to a default, so the shorter review pays only if it does not meaningfully raise the chance of default. That is the reason to refresh what can change: a borrower’s credit, cash, liens, current projects and the new deal itself. A streamlined review keeps those checks and skips the ones that cannot have changed, such as identity documents already verified and the track record already on file (verifying a borrower’s track record).
Write down who qualifies, for example borrowers with a stated number of loans paid on time, and apply it to everyone the same way. A shorter review granted by feel, to some and not others, is harder to defend than one granted by a written rule (borrower scorecard).
Making it routine
- Write the criteria for the shorter review.
- Keep a fixed list of items to refresh every time.
- Record the outcome of every loan by review type.
- Have an attorney review the policy.
Run your own numbers
Use the free fix-and-flip loan sizer below to size each new loan on its own numbers.