A Rate Floor: What a Loan Must Earn to Cover Its Costs
A borrower asks for a lower rate, and you are tempted because the deal is good. The question is whether the lower rate still pays for what the loan costs you. A rate floor answers that before the conversation starts.
The steps
- Put a percentage on your cost of money: what the capital would earn elsewhere, or what you pay to borrow it.
- Add overhead as a percentage of the amount lent: staff time, software, insurance, legal.
- Add expected losses as a percentage of the amount lent per year (pricing by risk tier).
- The sum is the floor. Add the margin you want to get the target rate.
- Compare any quoted rate with the floor, and convert the gap to dollars.
A worked example
Example (illustrative arithmetic, not benchmarks)
Cost of money 8.0%, overhead 1.5%, expected losses 1.0%: a floor of 10.5%. A target margin of 0.5% makes the target rate 11.0%. A $150,000 loan for 8 months is $100,000 of dollar-years, so each percentage point of yearly rate is $1,000. Every figure is a made-up round number.
| Rate quoted | Gap to the 10.5% floor | Result on the loan (× $1,000 a point) |
|---|---|---|
| 9.5% | −1.0 | −$1,000 |
| 10.5% | 0.0 | $0 |
| 11.0% | +0.5 | +$500 |
| 12.0% | +1.5 | +$1,500 |
A loan at 9.5% loses $1,000 over its life on these assumptions, even if it pays off perfectly, because the lender’s costs and expected losses exceed what it earns. A discount on rate is a real cost, and it is easier to refuse once you can name the number. Points and fees change the picture, because they add to the earnings on a short loan; include them in the comparison (lender effective yield).
Floors are only as good as their inputs. Revisit each one yearly: the cost of money changes, overhead per loan changes with volume, and the loss rate comes from your record, not from a guess. And remember that the floor is a minimum for the average loan. A riskier loan needs more, and a safer one may justify a rate a little lower.
Making it routine
- Compute the floor each year from your own numbers.
- Quote at or above it unless a written exception is approved.
- Record exceptions and what they cost.
- Confirm rate limits with an attorney.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the interest and points on a loan at different rates.