Reviewing a Draw Request: A Lender's Checklist and Red Flags

By DeskTech HQ · · 2 min read

A construction holdback is a promise to pay for work as it is finished. Each draw request is a check on that promise: has the work happened, is it paid for, and is there enough left to finish.

A review checklist

  1. Match the request to the budget. Each line should be in the approved budget (how a draw schedule works).
  2. Inspect the work. Compare what is claimed with what is there, line by line.
  3. Check the paperwork. Invoices, and lien waivers or releases if the documents or the state call for them.
  4. Apply retainage. Hold the agreed percentage.
  5. Check what is left. Make sure the undrawn holdback covers the remaining work.
  6. Record it. Add the draw to the ledger and the loan file (ledger reconciliation).

A worked example

Example (illustrative arithmetic, not market data)

Assume a $60,000 holdback, a first draw request of $18,000, and 10% retainage. The 10% is an assumption for the example. Every figure is a made-up round number.

Budget line Requested Inspected as complete Supported amount
Electrical, $10,000 line $10,000 60% 60% × $10,000 = $6,000
Plumbing, $8,000 line $8,000 100% $8,000
Total $18,000 $14,000
Step Calculation Amount
Unsupported part of the request $18,000 − $14,000 $4,000
Retainage held 10% × $14,000 $1,400
Funded now $14,000 − $1,400 $12,600
Holdback left to draw $60,000 − $14,000 $46,000

The lender funds $12,600 instead of $18,000, and holds $1,400 until completion. The electrical line shows the gap an inspection is there to find.

Red flags

  • A request larger than the inspected work.
  • Lines that run ahead of the schedule.
  • Missing invoices, or invoices from unfamiliar vendors.
  • Scope changes with no written approval (contractor payments and change orders).
  • Pressure to fund quickly with no inspection.
  • A remaining holdback that no longer covers the remaining work.

What to do with a gap

Fund what is supported, explain the rest in writing, and note when the borrower may resubmit. Keep the inspection report and the explanation in the loan file (what a lender tracks after closing).

Size the loan against the deal

Use the free loan sizer below to compare the loan and the holdback with the property’s value.

Quick answers

What is a draw request?

A draw request is the borrower's written request for part of the construction holdback, usually listing the work completed since the last draw and the amount requested for each line of the budget.

Why inspect before funding a draw?

The inspection checks that the work claimed has actually been done. Funding only for completed work keeps the amount of money out the door in line with the value added to the property.

What is retainage on a draw?

Retainage is a percentage of each draw that the lender holds back until the project is complete. It gives everyone a reason to finish the job and can be released at final completion under the loan documents.

What are common red flags?

Requests for more than the inspected work supports, requests that jump ahead of the schedule, missing invoices or lien paperwork, changes to the scope with no written approval, and requests that arrive just before a payment is due.

Do the numbers in this guide apply to my loans?

No. The examples are illustrative arithmetic with round numbers, including the 10% retainage, which is an assumption and not a standard. Draw, retainage and lien rules vary by state and loan documents.

Keep reading

Draw management

A Better Draw Request Form: Payback on Time Saved

Learn how to price the time a clearer draw request form saves by cutting returned and incomplete requests, and how many months it takes to pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.