Have the Contractor Initial Each Draw Request Line
A draw request lists ten lines. Weeks later the contractor says one amount was not what they asked for. Initials beside each line take three minutes to collect. The question is how likely a line dispute is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a line dispute: time to reconstruct what was asked.
- Break-even chance = step cost ÷ dispute cost.
- Pair it with photos (match the address on draw photos).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 3 minutes at $60 an hour: $3. A line dispute would cost $300 to sort out. Every figure is a made-up round number.
| Chance of a line dispute | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3 | $0 (break-even) |
| 3% | $9 | +$6 |
| 5% | $15 | +$12 |
The step pays at a 1% chance of a line dispute: $3 ÷ $300. Across many requests, that is likely.
Have the contractor initial and date each line before you approve, keep the signed copy with the loan file, and do not change an amount after initials without a new initial. Have a lawyer review the form.
Making it routine
- Collect initials and a date on each line.
- Keep the signed copy in the loan file.
- Re-initial any change.
- Have a lawyer review the form.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how draws and interest add up on a rehab loan.