Contractor Payment Schedules and Change Orders

By DeskTech HQ · · 2 min read

A rehab usually goes wrong on paper before it goes wrong on site. A payment schedule that follows finished work and a habit of writing changes down protect the budget, the schedule and the relationship with the contractor.

A payment schedule that follows the work

  • Deposit. A modest amount at signing.
  • Stage payments. Paid when named stages are complete and inspected.
  • Final payment. Held until the work is complete, required inspections pass and any releases are in hand (permits and inspections).

The payment steps should match the scope of work, line by line (how to write a scope of work).

A worked example

Example (illustrative arithmetic, not market data)

Assume a $40,000 contract. The percentages are made up for the example and are not a standard. Every figure is a made-up round number.

Payment Share Calculation Amount
Deposit at signing 10% 10% × $40,000 $4,000
Rough-in complete 30% 30% × $40,000 $12,000
Drywall complete 30% 30% × $40,000 $12,000
Substantial completion 20% 20% × $40,000 $8,000
Final, after sign-offs 10% 10% × $40,000 $4,000
Total 100% $40,000

After drywall, the contractor finds a rotted subfloor and a signed change order adds $2,400.

Item Calculation Amount
Paid so far $4,000 + $12,000 + $12,000 $28,000
New contract total $40,000 + $2,400 $42,400
Still to pay $42,400 − $28,000 $14,400
Contingency left 10% × $40,000 = $4,000, less $2,400 $1,600

The change order is paid from the contingency, and the budget and the agreement still match (per square foot vs line item).

A checklist

  1. Tie every payment to a named stage, not a date.
  2. Write each change down, price it and sign it before the work starts.
  3. Update the budget the day a change order is signed.
  4. Keep copies of the agreement, change orders, inspection results and any releases in the project file (flip project checklist).
  5. Pay the final amount only after the closeout items are done.

Run your own numbers

Use the free maximum allowable offer calculator below to see how a larger rehab budget changes what you can pay for a property.

Quick answers

How should a contractor be paid on a rehab?

Many investors tie payments to finished stages of work, not to dates, with a small deposit up front and a final amount held back until the work is complete and any required sign-offs are in. The agreement should state the schedule.

What is a change order?

A change order is a written change to the scope, price or schedule of the original agreement, signed by both sides before the extra work is done. It keeps the budget and the agreement matched.

What is retainage?

Retainage is a percentage of the contract price held until the work is finished. It gives the owner a reason to see the job closed out, and rules on holding and releasing it can vary by state.

Why get change orders in writing?

Verbal changes are hard to prove and easy to dispute. A written change order records what was added, what it costs and how it changes the total and the schedule.

Do the numbers in this guide apply to my project?

No. The examples are illustrative arithmetic with round numbers, including the payment percentages, which are assumptions and not a standard. Contract and licensing rules vary by state, so confirm what applies.

Keep reading

Flip project management

Budget Check Frequency: Weekly or Monthly?

Learn how to compare the extra time a weekly rehab budget check takes with the overrun it can catch weeks sooner, and the odds that make weekly worthwhile.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.