Gutters: Repair or Replace? The Years a Repair Must Last
A sagging or leaking gutter can be patched or replaced. The patch costs less now, but it lasts less long. The question is how long a repair has to hold to be the better buy.
The steps
- Get the cost of a full replacement and its expected life.
- Replacement cost per year = cost ÷ years.
- Break-even life of a repair = repair cost ÷ replacement cost per year.
- Judge whether the repair can last that long (roof repair, overlay or replace).
A worked example
Example (illustrative arithmetic, not quotes)
New seamless gutters cost $1,800 and last 25 years, $72 a year. The repair costs $250. Every figure is a made-up round number.
| Years the repair lasts | Repair cost per year | Replacement $72 − repair |
|---|---|---|
| 2 | $125 | −$53 (replacement cheaper) |
| 3.5 | $71 | ≈ $0 (break-even) |
| 5 | $50 | +$22 (repair cheaper) |
The repair has to last about three and a half years: $250 ÷ $72. If the gutters are sagging because the fascia behind them is rotted, a patch may last one season. If one joint has opened, a repair can hold for years.
Look at why the gutters failed before choosing. A repair on a sound system is a good buy. A repair on a failing one is only a delay (checking the plumbing before the drywall goes up).
Making it routine
- Inspect the fascia and the slope.
- Get both prices.
- Compute the break-even life.
- Replace when the repair will not clear it.