Wood or Vinyl Fence: The Years Vinyl Must Last
A wood fence costs less up front and needs upkeep. A vinyl fence costs more and needs little. Which is cheaper depends on how long the vinyl lasts.
The steps
- Cost per year of the wood fence = price ÷ life (plus yearly upkeep).
- Break-even life of the vinyl = vinyl price ÷ wood cost per year.
- Judge whether the vinyl is likely to last that long (the capex reserve by system age).
A worked example
Example (illustrative arithmetic, not quotes or product claims)
A wood fence costs $3,200 and lasts 15 years, $213 a year. A vinyl fence costs $5,400. Upkeep is left out for simplicity. Every figure is a made-up round number.
| Years the vinyl lasts | Vinyl cost per year ($5,400 ÷ years) | Wood $213 − vinyl |
|---|---|---|
| 20 | $270 | −$57 (wood cheaper) |
| 25.3 | $213 | $0 (break-even) |
| 30 | $180 | +$33 (vinyl cheaper) |
Vinyl has to last about twenty-five years to match wood at fifteen: $5,400 ÷ $213. If vinyl really lasts thirty, it wins. If it lasts twenty, wood does.
Add upkeep and the picture shifts. A wood fence that needs a stain every three years at $400 adds about $133 a year, which pushes the break-even for vinyl well below its expected life. Also check the rules: in many places the height, the setback and the materials are regulated, and a fence on the wrong side of the line is a legal problem (a temporary fence on a project).
Making it routine
- Get both prices with installation.
- Add yearly upkeep to wood.
- Compute the break-even life.
- Confirm permits and the property line.
Run your own numbers
Use the free BRRRR calculator below to see how a yearly exterior cost changes a rental’s cash flow.