Four Draws or Six? The Cost of Extra Draws

By DeskTech HQ · · 2 min read

On a rehab loan, each draw pays for work that has been done. The larger the draws, the more money is out the door ahead of what has been finished. More draws mean smaller gaps, but each one costs time and fees.

The steps

  1. Total the cost of one draw: inspection, title update and staff time.
  2. Multiply by the number of extra draws.
  3. Estimate how much less money is at risk with smaller draws.
  4. Break-even chance = added cost ÷ reduction in money at risk (the draw schedule).

A worked example

Example (illustrative arithmetic, not predictions)

One draw costs $265 ($150 inspection, $75 title update, $40 staff time). Moving from four draws to six adds two, so $530. Smaller draws cut the typical money at risk by $5,000. Every figure is a made-up round number.

Chance of an overpayment problem on the loan Expected loss avoided (chance × $5,000) Avoided − $530 added cost
5% $250 −$280
10.6% $530 $0 (break-even)
15% $750 +$220
20% $1,000 +$470

Six draws pay for themselves only if there is better than a one-in-ten chance of an overpayment problem: $530 ÷ $5,000. For an experienced borrower with a contractor you know, the chance may be well below that, and four draws are enough. For a first-time borrower, a new contractor or a large scope, the chance is higher and the extra draws are cheap protection.

The inspection is the main cost, so the saving is larger if you inspect before every draw (what draw inspections save). Check what the extra waiting does to the borrower: a contractor paid later may slow down, and delay has its own cost.

Making it routine

  1. Total the cost of one draw.
  2. Rate each loan’s risk: borrower, contractor, scope.
  3. Compute the break-even chance.
  4. Set the schedule when the loan is made.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how the rehab holdback and draw costs change what a loan earns.

Quick answers

Why use more draws?

Smaller draws mean less money paid ahead of finished work at any one time.

What does an extra draw cost?

An inspection, a title update and staff time. Add them up per draw.

What is the break-even chance?

The added cost of the extra draws divided by the reduction in money at risk.

Does the borrower care?

More draws mean more waiting and paperwork, so ask what the schedule does to the borrower's timeline.

Do the numbers in this guide apply to my loan?

No. The costs, exposure and odds are made up for the example. They are not predictions.