Have the Borrower Initial the Draw Schedule at Closing
Three months in, the borrower says the second draw was supposed to be bigger. Nobody can find a page that says otherwise. Having the borrower initial the schedule at closing takes four minutes. The question is how likely a we-agreed-differently dispute is for the step to pay.
The steps
- Price the step: minutes × the value of your time.
- Price a dispute: time reconstructing what was agreed.
- Break-even chance = step cost ÷ dispute cost.
- Set the schedule clearly (construction draw schedule).
A worked example
Example (illustrative arithmetic, not predictions)
The step takes 4 minutes at $60 an hour: $4. A dispute costs $400 to sort out. Every figure is a made-up round number.
| Chance of a we-agreed-differently dispute | Expected cost avoided (chance × $400) | Avoided − $4 |
|---|---|---|
| 0.5% | $2 | −$2 |
| 1% | $4 | $0 (break-even) |
| 3% | $12 | +$8 |
| 5% | $20 | +$16 |
The step pays at a 1% chance of a dispute: $4 ÷ $400. Across many loans, it is plausible.
Attach the draw schedule to the draw agreement, have the borrower initial and date it at closing, give them a copy and keep the original. Have a lawyer review how it is attached.
Making it routine
- Attach the schedule to the draw agreement.
- Have the borrower initial and date it.
- Give them a copy and keep the original.
- Have a lawyer review how it is attached.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how draw timing affects interest on a rehab loan.