Furniture for Staging: Rent or Buy?
Staging a flip means furniture, and furniture means a choice: rent a set for each flip or buy one and store it between jobs. Ownership looks cheaper if you do enough flips. The question is how many is enough.
The steps
- Get the cost to rent a set for one flip, delivery and pickup included.
- Price a set you would buy, its yearly storage and what it would sell for after a year.
- Net yearly cost of owning = purchase + storage − resale.
- Divide the net cost by the rental cost for one flip. That is the break-even number of flips a year.
- Add moving time and damage to both sides (staging and photos).
A worked example
Example (illustrative arithmetic, not quotes)
Renting a set costs $1,800 a flip. Buying a comparable used set costs $2,400, storage is $600 a year, and it resells for $1,000 after a year. Net yearly cost of owning: $2,400 + $600 − $1,000 = $2,000. Every figure is a made-up round number.
Break-even: $2,000 ÷ $1,800 = 1.1 flips a year.
| Staged flips per year | Cost to rent (× $1,800) | Cost to own | Cheaper |
|---|---|---|---|
| 1 | $1,800 | $2,000 | Rent, by $200 |
| 1.1 | $2,000 | $2,000 | Equal |
| 2 | $3,600 | $2,000 | Own, by $1,600 |
| 3 | $5,400 | $2,000 | Own, by $3,400 |
If you stage more than about one flip a year, owning wins on these numbers. The break-even is low because the rental price is high relative to the purchase. The comparison leaves out the time to move the set, the wear and damage, and the risk that one set does not suit every house. A set that must be styled differently for each property may cost more to adapt than a rental does.
It also leaves out whether you need staging at all. A house that shows well vacant, or a buyer who prefers to imagine their own furniture, may not need it. Decide that first, using your own sales records (own seasonal log).
Making it routine
- Record which flips were staged and how they sold.
- Count staged flips per year before buying a set.
- Include moving time in the cost of owning.
- Re-run the numbers if rental prices change.
Run your own numbers
Use the free closing net sheet below to see how a staging cost fits into what you walk away with.