Garage Door: Repair or Replace? The Years a Repair Must Buy

By DeskTech HQ · · 1 min read

A garage door that sticks, sags or shakes can be repaired or replaced. A repair costs less now. A new door looks better and lasts for years. The break-even is how many years the repair has to buy.

The steps

  1. Cost per year of replacement = price ÷ expected life.
  2. Break-even life of the repair = repair cost ÷ replacement cost per year.
  3. Judge whether the repair can buy that long (repairing or replacing gutters).

A worked example

Example (illustrative arithmetic, not quotes)

A new door installed costs $1,400 and lasts 20 years, $70 a year. A repair costs $250. Every figure is a made-up round number.

Years the repair buys Repair cost per year ($250 ÷ years) Replacement $70 − repair
2 $125 −$55 (replacement cheaper)
3.6 $70 $0 (break-even)
6 $42 +$28 (repair cheaper)

A repair has to buy about three and a half years: $250 ÷ $70. A broken spring on a sound door can easily buy ten years. A bent panel on a worn track may buy two.

On a flip, appearance counts as well. A garage door is a large part of the front of a house, and a dented or faded door can pull down curb appeal. In that case, the comparison is between a repair that works and a replacement that also looks right (sewer line repair or replace).

Making it routine

  1. Have a technician say what is wrong and why.
  2. Get both prices.
  3. Compute the break-even life.
  4. Use qualified technicians for springs and openers.

Run your own numbers

Use the free holding cost calculator below to see what a small exterior delay costs each day.

Quick answers

How do I compare repair and replacement?

Divide each cost by the years it will last.

What is the break-even?

The repair cost divided by the replacement's cost per year.

Who should repair springs?

Qualified technicians. Springs are dangerous.

What about appearance?

A door that looks bad may cost you on a flip even if it works.

Do the numbers in this guide apply to my property?

No. The costs and lives are made up for the example. They are not quotes.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.