Sewer Line: Repair or Replace? The Years It Must Last
A failed section of sewer line can be dug up and patched, or the whole line can be replaced. The patch costs less now. The question is how long it has to hold for that to be the cheaper choice.
The steps
- Cost per year of replacement = cost ÷ expected years.
- Break-even life of the repair = repair cost ÷ replacement cost per year.
- Use a camera inspection to judge whether the rest of the line can last that long (a sewer scope before an offer).
A worked example
Example (illustrative arithmetic, not quotes)
Replacing the line costs $9,500 and lasts 50 years, $190 a year. A spot repair costs $2,200. Every figure is a made-up round number.
| Years the repair lasts | Repair cost per year ($2,200 ÷ years) | Replacement $190 − repair |
|---|---|---|
| 5 | $440 | −$250 (replacement cheaper) |
| 11.6 | $190 | $0 (break-even) |
| 20 | $110 | +$80 (repair cheaper) |
A repair has to last about eleven and a half years to match a full replacement: $2,200 ÷ $190. If the rest of the line is old clay or cast iron, a patch may fail again in a few years. If the failure is one root-damaged joint in a sound line, it can last decades.
The camera inspection is what decides it. A line that is failing in several places should be replaced once. A single defect in good pipe is worth patching (roof repair or replace).
Making it routine
- Get a camera inspection before choosing.
- Get prices for both from licensed plumbers.
- Compute the break-even life.
- Check who is responsible for the lateral.
Run your own numbers
Use the free holding cost calculator below to see what a plumbing delay costs each day.