Record the Time Each Draw Wire Is Sent in the Draw Log

By DeskTech HQ · · 1 min read

A contractor says the wire arrived Thursday morning, a day late. Your records say it went Wednesday afternoon, but no time is written down. One more column in the draw log takes a minute per draw. The question is how likely a when-did-you-send-it dispute is for the entry to pay.

The steps

  1. Price the entry: minutes × the value of your time, per draw.
  2. Price a dispute: time pulling bank records and calming a contractor.
  3. Break-even chance = entry cost ÷ dispute cost.
  4. Use a memo too (memo line on every draw payment).

A worked example

Example (illustrative arithmetic, not predictions)

The entry takes 1 minute at $60 an hour: $1. A dispute costs $100 to resolve. Every figure is a made-up round number.

Chance of a when-did-you-send-it dispute Expected cost avoided (chance × $100) Avoided − $1
0.5% $0.50 −$0.50
1% $1 $0 (break-even)
3% $3 +$2
5% $5 +$4

The entry pays at a 1% chance of a dispute: $1 ÷ $100. Across many draws, it is plausible.

Write the date, the time the wire was released and the bank’s reference number in the draw log the moment you send it. The bank’s records control, so use the log to find them quickly.

Making it routine

  1. Write the date and time at release.
  2. Add the bank’s reference number.
  3. Use the log to find the bank record quickly.
  4. Remember that the bank’s records control.

Run your own numbers

Use the free fix-and-flip loan sizer below to see how draw timing affects interest on a rehab loan.

Quick answers

What do you record?

The date, the time the wire was released and the bank's reference.

How do I price it?

The minutes per draw times the value of your time.

What does a when-did-you-send-it dispute cost?

Time pulling bank records and calming a contractor.

What is the break-even chance?

The entry's cost divided by that cost.

Do the numbers in this guide apply to my draws?

No. The time, costs and odds are made up for the example. They are not predictions.