Appraisal, BPO or AVM: How Lenders Check Value

By DeskTech HQ · · 2 min read

Every loan sizing starts with a value, and there is more than one way to get one. Lenders choose among them based on cost, speed and how much weight the loan can put on the number.

Three common sources

  • Appraisal. A licensed appraiser’s written opinion, usually with an inspection and comparable sales. Slowest and costliest, and usually the most thorough.
  • Broker price opinion. A broker’s estimate from recent comparable sales. Faster and cheaper, and it is not an appraisal.
  • Automated valuation model. A data-driven estimate with no visit. Fastest, and it can miss condition and recent work.

The estimate behind a rehab loan is usually the after-repair value (estimating ARV with comps).

A worked example

Example (illustrative arithmetic, not market data)

Assume three values for the same property and a lender that lends 70% of value. The 70% is an assumption for the example, not a standard. Every figure is a made-up round number.

Source Value 70% of value
Appraisal $225,000 $157,500
Broker price opinion $218,000 $152,600
Automated valuation $231,000 $161,700

A lender that uses the lowest value would size the loan at $152,600. One that used the average of the three, ($225,000 + $218,000 + $231,000) ÷ 3, about $224,667, would size it at 70% × $224,667, about $157,267.

That is a difference of roughly $4,667 in the loan amount, from the choice of which number to trust (LTV, LTC and ARV).

How to decide

  1. Write down which value the loan program uses before the file is opened.
  2. Order the same type of value for every loan of the same kind.
  3. Look at the comparable sales behind the number, not only the total.
  4. Re-check value when the project changes or runs long.
  5. Keep the report with the loan file (a pre-funding checklist).

For borrowers

Ask the lender which value it will use and what it will cost. A low value changes the loan amount and the cash you need at closing (hard money versus private money loans).

Size the loan against the deal

Use the free loan sizer below to see how the value used changes the loan amount.

Quick answers

What is an appraisal?

An appraisal is a written opinion of a property's value by a licensed appraiser, usually based on an inspection and comparable sales. Rules on who may order and perform one vary by loan type and state.

What is a broker price opinion?

A broker price opinion, or BPO, is an estimate of value from a real estate broker or agent using recent comparable sales. It is usually quicker and cheaper than an appraisal and is not an appraisal.

What is an AVM?

An automated valuation model estimates value from data and a statistical model, with no visit to the property. It is fast, and it may miss condition, recent renovation or local details.

Why would a lender use the lowest value?

Using the lowest of several values leaves the most room if the property sells for less than expected. Each lender sets its own policy, and the loan documents or program rules say which value applies.

Do the numbers in this guide apply to my loan?

No. The examples are illustrative arithmetic with round numbers, including the 70% loan-to-value, which is an assumption and not a standard. Valuation rules vary by lender, loan type and state.

Keep reading

Private and hard money lending

How Lenders Review a Borrower's Exit Plan

Learn how a short-term lender checks that a borrower's plan to sell or refinance will repay the loan, with a worked example and a value stress test.

· 2 min read
Private and hard money lending

How to Read a Fix-and-Flip Loan Term Sheet

Learn what the rate, points, term, advance and fee lines on a short-term loan term sheet mean, with a worked cost example and questions to ask first.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.