Interest-Only Loan Payments: How Short-Term Loans Work

By DeskTech HQ · · 3 min read

Most short-term loans on flips work the same way: the borrower pays interest each month, the balance stays flat, and the whole amount comes due at the end. That is an interest-only loan with a balloon payment. It keeps monthly payments low while the property is being renovated, but it only works if there is a clear way to repay the balance when it matures.

How the payment works

Monthly interest = loan balance × annual rate ÷ 12

Because nothing is paid toward principal, the payment stays the same as long as the balance does. When the term ends, the full balance is due, plus any unpaid interest and fees.

A worked example

Example (illustrative arithmetic, not market data)

Assume a $150,000 loan at 12% a year, interest-only, for a six-month term, with 2 points charged at closing. Every figure is a made-up round number.

Item Calculation Amount
Monthly interest $150,000 × 0.12 ÷ 12 $1,500
Interest over six months $1,500 × 6 $9,000
Points at closing 2% × $150,000 $3,000
Total cost of borrowing $9,000 + $3,000 $12,000
Balloon due at the end the original balance $150,000

The cost is $12,000 on $150,000, which is 8% for six months. Spread over a year that is about 16%, higher than the 12% rate alone because the points are charged up front. That is why it helps to compare loans on total cost, not just the rate (how loans are sized).

When part of the loan is held back

Many flip loans fund the purchase first and hold back part of the loan for the rehab, which is paid out in draws (how draws work). Interest then usually accrues only on what has been funded.

Example (illustrative arithmetic, not market data)

Same $150,000 loan at 12%, but $100,000 is funded at closing and the other $50,000 is drawn at the start of month 4.

Months Funded balance Monthly interest Total
1 to 3 $100,000 $1,000 $3,000
4 to 6 $150,000 $1,500 $4,500
Interest over six months $7,500

That is $1,500 less than the $9,000 in the first example, because part of the loan was not funded for the first three months. The points are usually still charged on the full amount, so check how your loan treats them.

What to watch for

  • The balloon. Know exactly how the balance will be repaid, by a sale or a refinance (comparing exit strategies).
  • Delays. Each extra month costs another interest payment, and extensions may carry fees (holding costs).
  • Minimum interest. Some loans charge a minimum amount of interest even if you repay early.
  • How interest is counted. Rates may be quoted on a 360-day or 365-day basis, and it can change the payment slightly.
  • Fees beyond interest. Points, processing, inspection and draw fees all add to the cost.
  • What lenders must track. Payments, late charges, extensions and payoffs all need records (what a lender tracks after closing).

Compare the total, not the rate

A lower rate with high points can cost more than a higher rate with fewer points, depending on how long you keep the loan. Add up the interest, points and fees for the time you expect to hold it, and for a longer time in case of delays. Then size the loan against the deal with the free loan sizer below.

Quick answers

What does interest-only mean on a short-term loan?

The borrower pays only the interest each month, and the principal stays the same until the loan matures. At maturity the whole balance is due, usually from a sale or a refinance. That final payment is often called a balloon.

How do you calculate an interest-only payment?

Multiply the loan balance by the annual interest rate, then divide by 12. For example, a $150,000 balance at 12% a year is $150,000 × 0.12 ÷ 12 = $1,500 a month.

What are points on a loan?

Points are an upfront fee, with each point equal to 1% of the loan amount. Two points on a $150,000 loan is $3,000, usually paid at closing. They are a cost on top of the interest.

Why can the interest be lower when part of the loan is held back?

When part of the loan is a rehab holdback paid out in draws, interest usually accrues only on the amount actually funded. The monthly payment rises as more of the holdback is drawn.

Do the numbers in this guide apply to my loan?

No. The examples are illustrative arithmetic with round numbers, not market data. Rates, points, fees and how interest is calculated vary by lender and loan, and lending rules vary by state, so check your own terms.

See DeskTech Lending →

Keep reading

Private and hard money lending

How to Read a Fix-and-Flip Loan Term Sheet

Learn what the rate, points, term, advance and fee lines on a short-term loan term sheet mean, with a worked cost example and questions to ask first.

· 2 min read
Private and hard money lending

Interest Reserves in Private Money Loans Explained

Learn what an interest reserve is, how it reduces cash to the borrower, and what happens when a project runs past the months it covers, with an example.

· 2 min read
Private and hard money lending

Appraisal, BPO or AVM: How Lenders Check Value

Learn how an appraisal, a broker price opinion and an automated valuation differ, and how the value a lender uses changes the loan amount, with an example.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.