Keep a Box of Dust Masks at the Door for Visitors

By DeskTech HQ · · 1 min read

The inspector arrives while the crew is sanding. The air is white and they will not go in without protection. A box of masks at the door costs about fifteen dollars. The question is how likely a delayed visit is for the box to pay.

The steps

  1. Price the box: box + minutes × the value of your time.
  2. Price a delayed visit: a reschedule and idle time.
  3. Break-even chance = box cost ÷ delay cost.
  4. Schedule dusty work away from visits (text the crew tomorrow’s plan the evening before).

A worked example

Example (illustrative arithmetic, not predictions)

The box costs $15 plus 3 minutes at $60 an hour ($3): $18. A delayed visit costs $150. Every figure is a made-up round number.

Chance of a delayed visit Expected cost avoided (chance × $150) Avoided − $18
6% $9 −$9
12% $18 $0 (break-even)
24% $36 +$18
40% $60 +$42

The box pays at a 12% chance of a delayed visit: $18 ÷ $150. During sanding and demolition, it is plausible.

Keep the box by the door with a note, schedule dusty work away from visits and do not treat a basic mask as a respirator. For lead, asbestos or mold, bring in a qualified professional.

Making it routine

  1. Keep the box by the door with a note.
  2. Schedule dusty work away from visits.
  3. Do not treat a dust mask as a respirator.
  4. Use a professional for lead, asbestos or mold.

Run your own numbers

Use the free holding cost calculator below to see what a rescheduled visit costs on your own flip.

Quick answers

Why keep masks at the door?

Visitors in a dusty house may refuse to go in without one.

How do I price it?

The box plus the minutes to place it.

What does a delayed visit cost?

A rescheduled inspection or showing and idle time.

What is the break-even chance?

The box's cost divided by the delay cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Post a Site Sign-In Sheet at the Flip: The Odds

Learn how to price a clipboard sign-in sheet at a flip site and find the who-was-here dispute chance at which three minutes of setup pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.