Post a Site Sign-In Sheet at the Flip: The Odds

By DeskTech HQ · · 1 min read

A tool goes missing, a wall is damaged, a neighbor complains. Nobody can say who was on site and when. A clipboard sheet takes three minutes to set up. The question is how likely a who-was-here dispute is for it to pay.

The steps

  1. Price the setup: minutes × the value of your time.
  2. Price a who-was-here dispute: time to reconstruct visits.
  3. Break-even chance = setup cost ÷ dispute cost.
  4. Pair it with keys (keep a key log for every flip).

A worked example

Example (illustrative arithmetic, not predictions)

The setup takes 3 minutes at $60 an hour: $3. A who-was-here dispute costs $150 to sort out. Every figure is a made-up round number.

Chance of a who-was-here dispute Expected cost avoided (chance × $150) Avoided − $3
1% $1.50 −$1.50
2% $3 $0 (break-even)
5% $7.50 +$4.50
10% $15 +$12

The sheet pays at a 2% chance of a dispute: $3 ÷ $150. Over a flip with many trades, that is likely.

Use a clipboard with date, name, company and in and out times, check it at each visit and photograph it weekly for the file. It records visits only; it does not control access.

Making it routine

  1. Post a clipboard with a column for each field.
  2. Ask every visitor to sign.
  3. Photograph the sheet weekly.
  4. Keep the photos with the project file.

Run your own numbers

Use the free holding cost calculator below to see how each day of delay from a dispute adds to the cost of a flip.

Quick answers

What goes on the sheet?

Name, company, date and time in and out.

How do I price it?

The minutes to set it up times the value of your time.

What does a who-was-here dispute cost?

Time spent reconstructing who worked or visited.

What is the break-even chance?

The setup cost divided by the dispute cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Keep a Box of Dust Masks at the Door for Visitors

Learn how to price a box of dust masks kept at the door of a flip for visitors and find the chance of a delayed visit at which an eighteen-dollar box pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.