Leave a Ten-Dollar Hygrometer in the House During the Rehab

By DeskTech HQ · · 1 min read

A wet bathroom wall is closed up with drywall. A week later a musty smell appears and the readings in the house are high. A ten-dollar hygrometer on the kitchen counter would have flagged it. The question is how likely hidden moisture is for the meter to pay.

The steps

  1. Price the meter: cost + minutes × the value of your time.
  2. Price hidden moisture: mold, swelling and delay.
  3. Break-even chance = meter cost ÷ moisture cost.
  4. Dry out sensibly (rent a dehumidifier while the drywall dries).

A worked example

Example (illustrative arithmetic, not predictions)

The meter costs $10 plus 3 minutes at $60 an hour ($3): $13. Hidden moisture costs $650 to deal with. Every figure is a made-up round number.

Chance of hidden moisture Expected cost avoided (chance × $650) Avoided − $13
1% $6.50 −$6.50
2% $13 $0 (break-even)
4% $26 +$13
6% $39 +$26

The meter pays at a 2% chance of hidden moisture: $13 ÷ $650. In a damp season or a house with old leaks, it is plausible.

Place it in a central room, read it at each visit and write the number on the project log. Sustained high readings are a prompt to look for leaks and call a qualified professional.

Making it routine

  1. Place it in a central room.
  2. Read it at each visit.
  3. Write the number on the project log.
  4. Look for leaks if readings stay high.

Run your own numbers

Use the free holding cost calculator below to see what a day of delay for moisture costs on your own flip.

Quick answers

What is a hygrometer?

A small meter that shows the humidity in the air.

How do I price it?

The meter plus the minutes to place and read it.

What does hidden moisture cost?

Mold, swelling and a delay while it is dealt with.

What is the break-even chance?

The meter's cost divided by the moisture cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Keep a Box of Dust Masks at the Door for Visitors

Learn how to price a box of dust masks kept at the door of a flip for visitors and find the chance of a delayed visit at which an eighteen-dollar box pays.

· 1 min read
Flip project management

Post a Site Sign-In Sheet at the Flip: The Odds

Learn how to price a clipboard sign-in sheet at a flip site and find the who-was-here dispute chance at which three minutes of setup pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.