Leave a Pack of Felt Furniture Pads at Move-In: The Odds

By DeskTech HQ · · 1 min read

A tenant drags a dresser across a hardwood floor and leaves four gouges. At move-out you argue about wear and damage. A pack of felt pads left with a note costs about five dollars and a minute. The question is how likely a scratched-floor dispute is for the pack to pay.

The steps

  1. Price the pack: cost + minutes × the value of your time.
  2. Price a scratched-floor dispute: time and sometimes a refinish.
  3. Break-even chance = pack cost ÷ dispute cost.
  4. Protect floors during the rehab too (floor protection on a rehab).

A worked example

Example (illustrative arithmetic, not predictions)

The pack costs $5 plus 1 minute at $60 an hour ($1): $6. A scratched-floor dispute costs $120. Every figure is a made-up round number.

Chance of a scratched-floor dispute Expected cost avoided (chance × $120) Avoided − $6
2.5% $3 −$3
5% $6 $0 (break-even)
10% $12 +$6
20% $24 +$18

The pack pays at a 5% chance of a scratched-floor dispute: $6 ÷ $120. On hardwood or laminate, it is plausible.

Leave the pack with a short note, photograph the floors at move-in and keep the photos. Check your state and lease rules on wear and deposits.

Making it routine

  1. Leave the pack with a short note.
  2. Photograph the floors at move-in.
  3. Keep the photos.
  4. Check state and lease rules on deposits.

Run your own numbers

Use the free BRRRR calculator below to see how avoided disputes add up across a hold.

Quick answers

What do felt pads do?

They sit under furniture legs so they slide without scratching.

How do I price the pack?

The pack plus the minutes to leave it with a note.

What does a scratched-floor dispute cost?

Time and sometimes a refinish.

What is the break-even chance?

The pack's cost divided by the dispute cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.