Leave Working Bulbs at Move-In: The First-Week Call Odds
A tenant walks into a dark kitchen on the first night. The bulbs were not checked at turnover. A call follows, or a bad first impression. Fitting working bulbs costs a few dollars and minutes. The question is how likely a no-light call is for the step to pay.
The steps
- Price the step: bulbs plus minutes to fit them.
- Price a call about a dark fixture: the call, the trip or the goodwill lost.
- Break-even chance = step cost ÷ call cost.
- Compare with your first-week call log (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The step costs $10 in bulbs and time. A first-week call would cost $50. Every figure is a made-up round number.
| Chance of a first-week no-light call | Expected call cost avoided (chance × $50) | Avoided − $10 |
|---|---|---|
| 10% | $5 | −$5 |
| 20% | $10 | $0 (break-even) |
| 40% | $20 | +$10 |
| 60% | $30 | +$20 |
The step pays at a 20% chance of a call: $10 ÷ $50. In a unit with a dozen fixtures and old bulbs, a dead bulb on the first night is common.
Test every fixture at turnover, replace dead bulbs with the type the fixture needs, and say in the lease who replaces them later. Leave a spare bulb or two in a labeled bag for the tenant.
Making it routine
- Switch on every fixture at turnover.
- Replace dead bulbs with the right type.
- Leave a labeled spare.
- State who replaces bulbs in the lease.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.