Line of Credit vs Hard Money for a Short Flip

By DeskTech HQ · · 2 min read

A bank offers a $100,000 revolving line at 11% with a $300 annual fee. A hard money lender offers the same amount at 12% with 2 points. The line looks cheaper, and on interest it is. What is left to decide is how much the difference is worth and what you give up for it.

The steps

  1. Write each option’s rate, fees, points and limit (term sheet).
  2. Total the cost over your planned hold, with interest on the average amount drawn.
  3. Repeat with a higher rate on the variable one and a longer hold.
  4. Check the limit against the money the deal needs (cash timeline).
  5. List the non-price terms: guarantees, collateral, and the lender’s right to cut the line.

A worked example

Example (illustrative arithmetic, not offers)

A $100,000 need over 8 months. Line of credit: 11% interest on the drawn amount, plus a $300 annual fee. Hard money: 12% interest plus 2 points ($2,000). Every figure is a made-up round number.

Case Line of credit Hard money Hard money minus line
Fully drawn, rate 11% $7,333 + $300 = $7,633 $2,000 + $8,000 = $10,000 $2,367
Line rate rises to 13% $8,667 + $300 = $8,967 $10,000 $1,033
Line drawn 70% on average $5,133 + $300 = $5,433 $10,000 $4,567

The line is cheaper in every case, by $1,033 to $4,567. A two-point rise in the rate eats more than half the advantage (holding costs).

The interest is not the whole story. A credit line often depends on your personal finances and a guarantee, can have a limit below what a deal needs, and can be reduced or frozen by the lender. A hard money loan is priced higher, but the amount and the term are fixed once it closes (hard money vs private money).

So the question is how much certainty is worth: about $2,400 on this deal, or less if rates rise. Many investors use the line for the pieces it fits and keep another source for the rest.

Making it routine

  1. Keep a table of every financing source with its cost, limit and conditions.
  2. Test each at a higher rate and a longer hold before choosing.
  3. Ask each lender what it can change after closing.
  4. Record the real cost after each sale, and use it to update the table.

Run your own numbers

Use the free holding cost calculator below to price the interest on either source for your own hold.

Quick answers

Why would a credit line cost less than hard money?

It often has a lower rate and no points. You pay interest only on what you have drawn, and there may be a small annual fee.

What are the drawbacks?

The limit may be smaller than a deal needs, the rate may be variable, qualifying may take your personal finances and a guarantee, and the lender may reduce or freeze the line.

How do I compare them fairly?

Total all costs over your expected hold: interest, points and fees, then test a higher rate and a longer hold ([points vs rate](/blog/points-vs-rate-which-loan-offer-is-cheaper-for-your-hold)).

Can I use both?

Some investors use a line for deposits, small rehabs or part of the purchase and a short-term loan for the rest. Check each lender's rules on other liens and on how funds may be used.

Do the numbers in this guide apply to my financing?

No. The rates, fees, points and hold time are made up for the example. They are not offers or advice about any loan or line.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.