Look at the Homes Beside and Behind for Sightlines
The yard looks private in the listing photos. From the sidewalk you see a second-floor deck next door looking straight into the kitchen. A ten-minute look at the homes beside and behind finds the sightlines. The question is how likely a privacy problem is for the look to pay before you offer.
The steps
- Price the look: minutes × the value of your time.
- Price a privacy problem: a lower price or rent, or the cost of screening.
- Break-even chance = look cost ÷ privacy-problem cost.
- Listen at shared walls too (knock and listen at shared walls).
A worked example
Example (illustrative arithmetic, not predictions)
The look takes 10 minutes at $60 an hour: $10. A privacy problem costs $2,000 in price or screening. Every figure is a made-up round number.
| Chance of a privacy problem | Expected cost avoided (chance × $2,000) | Avoided − $10 |
|---|---|---|
| 0.25% | $5 | −$5 |
| 0.5% | $10 | $0 (break-even) |
| 1.5% | $30 | +$20 |
| 3% | $60 | +$50 |
The look pays at a 0.5% chance of a privacy problem: $10 ÷ $2,000. On a small lot with tall neighbors, it is easily exceeded.
From the sidewalk and inside the house, note windows and decks that look into the yard and rooms, photograph them and price screening such as fencing or planting. Stay on public ground.
Making it routine
- Note windows and decks that look into the yard and rooms.
- Photograph them from public ground.
- Price screening such as fencing or planting.
- Ask a local agent how buyers react.
Run your own numbers
Use the free MAO calculator below to see how a privacy discount changes the most you can offer.