Look for Basement Stains Before an Offer: The Odds

By DeskTech HQ · · 1 min read

Basement walls tell a story. White deposits, tide lines at one height and rusted nails point to water. A fresh coat of paint on only the lower wall points to someone hiding it. Looking takes ten minutes. The question is how likely a water problem is for the look to pay.

The steps

  1. Price the look: minutes × the value of your time.
  2. Estimate the cost of a water problem found late: waterproofing, mold work, lower value.
  3. Break-even chance = cost ÷ water problem cost.
  4. Follow up with an inspector (drainage fix before listing).

A worked example

Example (illustrative arithmetic, not predictions)

The look takes 10 minutes at $60 an hour: $10. A water problem found late would cost $4,000. Every figure is a made-up round number.

Chance the look reveals a water problem Expected loss avoided (chance × $4,000) Avoided − $10
0.1% $4 −$6
0.25% $10 $0 (break-even)
1% $40 +$30
3% $120 +$110

The look pays at a 0.25% chance of a water problem: $10 ÷ $4,000. In an older house on a slope, the chance is much higher.

Carry a flashlight, look at the lower foot of every wall, the floor edges and the sump or drain, and check what is stored against the walls. Ask the seller about past water. A stain proves little alone, so use it to direct the inspector.

Making it routine

  1. Bring a flashlight to the basement.
  2. Look at the bottom foot of every wall.
  3. Check the sump, drain and floor edges.
  4. Point the inspector at what you see.

Run your own numbers

Use the free MAO calculator below to see how a waterproofing cost changes the most you can offer.

Quick answers

What is efflorescence?

A white, powdery deposit left on masonry when water evaporates.

How do I price the look?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the cost of a water problem found late.

What else should I look for?

Tide lines on walls, rusted fasteners, a musty smell and newly painted lower walls.

Do the numbers in this guide apply to my deal?

No. The cost, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.