Match Dryer and Range Outlets to the Plugs Before Move-In

By DeskTech HQ · · 1 min read

A tenant moves in with a dryer that has a four-prong plug and the outlet has three slots. The first call of the lease is an electrician call. Looking at the outlets and appliances before move-in takes five minutes. The question is how likely a wrong-cord call is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a wrong-cord call: a visit and sometimes an electrician.
  3. Break-even chance = check cost ÷ call cost.
  4. Label the panel too (label the breaker panel at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 5 minutes at $60 an hour: $5. A wrong-cord call costs $100. Every figure is a made-up round number.

Chance of a wrong-cord call Expected cost avoided (chance × $100) Avoided − $5
2.5% $2.50 −$2.50
5% $5 $0 (break-even)
10% $10 +$5
20% $20 +$15

The check pays at a 5% chance of a wrong-cord call: $5 ÷ $100. In an older house with an older dryer outlet, it is plausible.

Look at the slots and the amperage on the dryer and range outlets, tell incoming tenants what type they have and never change a cord or outlet yourself. Use a licensed electrician.

Making it routine

  1. Look at the dryer and range outlets.
  2. Note the slots and amperage.
  3. Tell incoming tenants what type they have.
  4. Use a licensed electrician for any change.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What is the mismatch?

A three-prong plug and a four-prong outlet, or the reverse.

How do I price the check?

The minutes to look at the outlets and appliances times the value of your time.

What does a wrong-cord call cost?

A visit and sometimes an electrician.

What is the break-even chance?

The check's cost divided by the call cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.