Post Room Sizes on the Unit Sheet: Questions to Prevent

By DeskTech HQ · · 1 min read

A prospect asks whether a queen bed fits in the second bedroom. You say you think so. A second showing follows with a tape measure. A unit sheet with room sizes takes fifteen minutes to make once. The question is how many such questions it must prevent to pay.

The steps

  1. Price the sheet: minutes × the value of your time.
  2. Price a question: minutes of back-and-forth or a second showing.
  3. Break-even questions = sheet cost ÷ question cost.
  4. Pair it with other showing prep (caulk and touch up the baseboard gaps).

A worked example

Example (illustrative arithmetic, not benchmarks)

The sheet takes 15 minutes at $60 an hour: $15. A will-my-bed-fit question costs $5. Every figure is a made-up round number.

Questions prevented over a vacancy Cost avoided (questions × $5) Avoided − $15
1 $5 −$10
3 $15 $0 (break-even)
6 $30 +$15
10 $50 +$35

The sheet pays if it prevents 3 questions: $15 ÷ $5. With a handful of prospects through a vacancy, that is plausible.

Measure wall to wall in each room, note the main doorways and the closets, and say the sizes are approximate. Keep the sheet with the listing and update it after any change.

Making it routine

  1. Measure wall to wall in each room.
  2. Note doorway and closet widths.
  3. Say the sizes are approximate.
  4. Keep the sheet with the listing.

Run your own numbers

Use the free BRRRR calculator below to see what each vacant day costs on your own rental.

Quick answers

What goes on the sheet?

Each room's length and width and the main doorway widths.

How do I price the work?

The minutes to measure and type it up times the value of your time.

What does a will-my-bed-fit question cost?

A few minutes of back-and-forth, sometimes a second showing.

What is the break-even count?

The work's cost divided by the cost of one question.

Do the numbers in this guide apply to my rental?

No. The times and counts are made up for the example. They are not benchmarks.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.