Caulk the Baseboard Gaps Before Showing: The Odds
A prospect walks the unit and sees dark gaps between the baseboards and the walls. The rest looks fine, but the gaps say “unfinished”. Twenty minutes with a caulk gun and a brush closes them. The question is how likely a prospect is to pass over the gaps for the work to pay.
The steps
- Price the work: caulk and paint + minutes × the value of your time.
- Price a passed prospect: extra days of vacancy.
- Break-even chance = work cost ÷ cost of the lost days.
- Pair it with the toilet seat (new toilet seat at turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The work costs $5 of caulk and paint plus 20 minutes at $60 an hour ($20): $25. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.
| Chance a prospect passes over the gaps | Expected cost avoided (chance × $100) | Avoided − $25 |
|---|---|---|
| 12.5% | $12.50 | −$12.50 |
| 25% | $25 | $0 (break-even) |
| 40% | $40 | +$15 |
| 60% | $60 | +$35 |
The work pays at a 25% chance that a prospect passes over the gaps: $25 ÷ $100. Where a unit competes with fresh listings, it is plausible.
Cut the caulk tip small, run a thin bead, smooth it with a damp finger and touch up the paint. If the gap keeps reopening, find out why before you caulk it again.
Making it routine
- Cut the caulk tip small.
- Run a thin bead.
- Smooth it and touch up paint.
- Find out why if the gap reopens.
Run your own numbers
Use the free BRRRR calculator below to see what each vacant day costs on your own rental.