Minimum Profit: A Percent Rule, a Dollar Floor or Both?
A rule that says “I need 10% of the after-repair value” sounds disciplined. On a $120,000 house it asks for $12,000 of profit, about the same work and risk as a $250,000 house that would pay $25,000. A rule with both a percentage and a dollar floor handles the two ends better.
The steps
- Set a minimum percentage of after-repair value that covers the risk of being wrong about value and cost.
- Set a dollar floor that covers the time and fixed costs of any project.
- For each deal, the required profit is the larger of the two.
- Compare the required profit with the profit the deal shows at your offer price.
- Revisit both numbers each year, using your own record (flip buy box).
A worked example
Example (illustrative arithmetic, not standards)
The rule: at least 10% of the after-repair value (ARV), and never less than $25,000. Every figure is a made-up round number.
| ARV | 10% of ARV | Dollar floor | Required profit (the larger) | As a share of ARV |
|---|---|---|---|---|
| $180,000 | $18,000 | $25,000 | $25,000 | 13.9% |
| $250,000 | $25,000 | $25,000 | $25,000 | 10.0% |
| $400,000 | $40,000 | $25,000 | $40,000 | 10.0% |
The dollar floor does its work on the cheapest house: it asks for 13.9% of value, because a flip that earns $18,000 for the same effort as a $25,000 one is a worse use of time. The percentage does its work on the most expensive house: it asks for $40,000, because a $25,000 profit on a $400,000 house is a thin 6.3% cushion against a 5% error in value.
A percentage alone would let in the $180,000 deal at $18,000. A floor alone would let in the $400,000 deal at $25,000. Together they filter out both. The numbers should come from your record: what a project costs in time, how often you are surprised and by how much (profit per hour).
A rule is a filter, not a forecast. It tells you which deals deserve a closer look. A deal that passes still needs a careful estimate, and one that fails by a little deserves a second look at the price, not a lowered bar (choosing between two deals).
Making it routine
- Write down both numbers.
- Apply the larger one to every deal.
- Compare the rule with how past deals actually turned out.
- Adjust once a year, not deal by deal.
Run your own numbers
Use the free MAO calculator below to find the offer that leaves your required profit.