Number Every Signed Change Order in One Folder

By DeskTech HQ · · 1 min read

A contractor points to change order 3 and says it added the deck. Your copy of change order 3 does not mention a deck. Neither of you can say which is the signed one. A numbered folder takes ten minutes to set up. The question is how likely a which-version dispute is for the folder to pay.

The steps

  1. Price the folder: minutes × the value of your time.
  2. Price a which-version dispute: time finding the signed copy and sometimes paying twice.
  3. Break-even chance = folder cost ÷ dispute cost.
  4. Price changes before the work (change orders: price them before the work, not after).

A worked example

Example (illustrative arithmetic, not predictions)

The folder takes 10 minutes at $60 an hour: $10. A which-version dispute costs $500. Every figure is a made-up round number.

Chance of a which-version dispute Expected cost avoided (chance × $500) Avoided − $10
1% $5 −$5
2% $10 $0 (break-even)
5% $25 +$15
8% $40 +$30

The folder pays at a 2% chance of a which-version dispute: $10 ÷ $500. On a flip with many changes, it is plausible.

Number each change order in order, put the date and the total in the file name, keep only the signed copy in the folder and send both sides a PDF. Put no change into work until it is signed.

Making it routine

  1. Number each change order in order.
  2. Put the date and total in the file name.
  3. Keep only the signed copy in the folder.
  4. Do no changed work until it is signed.

Run your own numbers

Use the free holding cost calculator below to see what a week of dispute delay costs on your own flip.

Quick answers

What does numbering do?

Each change order gets a number, a date and a place in the folder.

How do I price it?

The minutes to set up and keep the folder times the value of your time.

What does a which-version dispute cost?

Time finding the signed copy and sometimes paying for work twice.

What is the break-even chance?

The folder's cost divided by that cost.

Do the numbers in this guide apply to my flip?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Flip project management

Ask for a Photo of Each Delivered Material Pallet

Learn how to price asking the contractor for a photo of each delivered material pallet and find the short-shipment chance at which two minutes pays.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.