One Shared Digital Folder Per Flip: Searches It Must Save
The inspector wants the permit. The lender wants the receipts. Both are somewhere in email, a phone or a truck. One shared folder per flip takes twenty minutes to set up. The question is how many where-is-the-file searches it must save to pay.
The steps
- Price the setup: minutes × the value of your time.
- Price a search: minutes of hunting.
- Break-even searches = setup cost ÷ search cost.
- Start it at the kickoff (kickoff call before the first draw).
A worked example
Example (illustrative arithmetic, not benchmarks)
The setup takes 20 minutes at $60 an hour: $20. A search costs 10 minutes: $10. Every figure is a made-up round number.
| Searches saved on the flip | Cost avoided (searches × $10) | Avoided − $20 |
|---|---|---|
| 1 | $10 | −$10 |
| 2 | $20 | $0 (break-even) |
| 4 | $40 | +$20 |
| 8 | $80 | +$60 |
The folder pays if it saves 2 searches: $20 ÷ $10. Across a flip with permits, inspections and draws, that is ordinary.
Make one folder per property with the same subfolders each time, name files with the date first, and give access only to the people who need it. Remove access when work ends.
Making it routine
- Make one folder per property.
- Use the same subfolders every time.
- Date-first file names.
- Remove access when work ends.
Run your own numbers
Use the free holding cost calculator below to see what a day of delay for a missing document costs on your own flip.