Put a One-Page Site Map on the Wall With the Shutoffs
A pipe starts to leak and a new crew member cannot find the main. An inspector asks where the panel is. A one-page sketch on the wall takes fifteen minutes. The question is how many where-is-it questions the map must prevent to pay.
The steps
- Price the map: minutes × the value of your time.
- Price a where-is-it question: minutes of searching or a call.
- Break-even questions = map cost ÷ question cost.
- Tag the valves too (tag every water shutoff valve with what it controls).
A worked example
Example (illustrative arithmetic, not benchmarks)
The map takes 15 minutes at $60 an hour: $15. A where-is-it question costs $5. Every figure is a made-up round number.
| Questions prevented over the flip | Cost avoided (questions × $5) | Avoided − $15 |
|---|---|---|
| 1 | $5 | −$10 |
| 3 | $15 | $0 (break-even) |
| 6 | $30 | +$15 |
| 12 | $60 | +$45 |
The map pays if it prevents 3 questions: $15 ÷ $5. Across a flip with many trades and visitors, that is ordinary.
Sketch each floor, mark the water main, shutoffs, panel and sump, post it by the entry and check it against the house. Update it if anything moves. Do not open a panel unless you are qualified.
Making it routine
- Sketch each floor.
- Mark the main, shutoffs, panel and sump.
- Post it by the entry.
- Update it if anything moves.
Run your own numbers
Use the free holding cost calculator below to see what a day of leak delay costs on your own flip.