Open and Lock Every Window at Turnover: The Odds
A window that is painted shut, will not stay open or will not lock is a complaint waiting to happen, and in a bedroom it may be a safety problem. Opening and locking every window takes a few minutes at turnover. The question is how likely a problem is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price a later call: the call, the trip and the fix.
- Break-even chance = check cost ÷ call cost.
- Compare with the age of the windows (replace the windows before listing).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The check takes 3 minutes at $60 an hour: $3. A later call would cost $150. Every figure is a made-up round number.
| Chance a window has a problem a tenant would report | Expected call cost avoided (chance × $150) | Avoided − $3 |
|---|---|---|
| 1% | $1.50 | −$1.50 |
| 2% | $3.00 | $0 (break-even) |
| 5% | $7.50 | +$4.50 |
| 10% | $15.00 | +$12.00 |
The check pays at a 2% chance of a problem: $3 ÷ $150. In an older house with painted sashes and worn locks, it is far higher.
Open each window fully, check that it stays open, close it and lock it. Note any that stick, rattle or will not lock. Pay special attention to bedroom windows, which may be needed to escape a fire, and fix those first with qualified help.
Making it routine
- Open, close and lock every window.
- Note sticking, loose and unlockable windows.
- Fix bedroom windows first.
- Log the results.
Run your own numbers
Use the free BRRRR calculator below to see how a window repair changes a rental’s yearly cash flow.