Check Water Pressure With a Gauge at Turnover: The Odds

By DeskTech HQ · · 1 min read

Water pressure that is too high strains hoses, valves and fixtures. Pressure that is too low draws complaints. A gauge on a hose bib costs about ten dollars and reads the pressure in seconds. The question is how likely a problem is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the cost of a pressure problem found later: a leak, a failed fixture, a complaint.
  3. Break-even chance = check cost ÷ later cost.
  4. Compare with the age of the plumbing (washer drain pan and shutoff).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The check takes 3 minutes at $60 an hour: $3. A pressure-related problem found later would cost $120. Every figure is a made-up round number.

Chance of a pressure problem Expected cost avoided (chance × $120) Avoided − $3
1% $1.20 −$1.80
2.5% $3.00 $0 (break-even)
5% $6.00 +$3.00
10% $12.00 +$9.00

The check pays at a 2.5% chance of a problem: $3 ÷ $120. In a house with an old regulator or on a high-pressure street, the chance is higher.

Screw the gauge onto a hose bib, open the tap fully with nothing else running and read it. Note the number against your local code and the fixtures’ limits. If it is outside the range, ask a plumber about a regulator or an expansion tank.

Making it routine

  1. Read the pressure at a hose bib.
  2. Compare it with local code and fixture limits.
  3. Ask a plumber about a regulator if it is outside.
  4. Log the reading.

Run your own numbers

Use the free BRRRR calculator below to see how a plumbing repair changes a rental’s yearly cash flow.

Quick answers

What does a gauge show?

The pressure at a hose bib, which can be too high or too low.

How do I price the check?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the cost of a pressure-related problem later.

What is too high?

Check your local plumbing code and the manufacturers' limits.

Do the numbers in this guide apply to my rental?

No. The cost and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.