Peak Season Help: Does a Temp Pay for Itself?
Spring brings flips, and flips bring loan requests. For three months a lender’s volume doubles, and the staff who handle it do not. Either some requests wait, or quality slips, or someone is hired for the season. The question is how many extra loans the help has to make possible.
The steps
- Estimate the extra loans you would close with help during the peak, compared with without.
- Take the net income of a typical loan (loan-level profit).
- Price the help: pay, payroll costs, training time and supervision.
- Divide the cost by the income per loan. That is the break-even number of extra loans.
- Set limits on what the helper can see and do.
A worked example
Example (illustrative arithmetic, not benchmarks)
Part-time help costs $1,200 a month for the 3-month peak: $3,600. A loan nets $5,000. Every figure is a made-up round number.
Break-even: $3,600 ÷ $5,000 = 0.72 loans.
| Extra loans closed because of the help | Income (× $5,000) | Cost | Net |
|---|---|---|---|
| 0 | $0 | $3,600 | −$3,600 |
| 2 | $10,000 | $3,600 | +$6,400 |
| 4 | $20,000 | $3,600 | +$16,400 |
| Break-even | 0.72 loans |
If the help lets you close even one loan you would otherwise have turned away or lost to delay, it pays. That is the point: at $5,000 a loan, the staffing cost is small. The real questions are whether the help actually creates capacity, and whether the quality holds. A helper who needs half your time to supervise adds little.
Use the help for the work that is repeatable and low-risk: collecting documents, ordering routine items, entering data, scheduling. Keep underwriting decisions, wires and communications about terms with you. Give access only to what each task requires, and have a written confidentiality agreement (wire fraud prevention).
Making it routine
- Track monthly volume to see the peak coming.
- Line up help a month before it starts.
- Write down what the helper may and may not do.
- Review the arrangement with an attorney or accountant.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the income on a loan you would be able to close.